![]() |
Land Surveying
- Land Planning - Land |
|||||
MH engineering Co. |
||||||
| 16075
Vineyard Blvd. Morgan Hill, CA 95037 (408) 779-7381 |
|
|||||
|
A part of Morgan Hill since 1975
|
||||||
|
PROJECTS |
|
|
A listing of some of our projects. City of Morgan Hill Morgan Hill Community Center -Design of grading, drainage and utilities Downtown Sewer Bypass - Design of an 18" sewer line between Tennant Avenue and Main Avenue along the East side of Southern Pacific Railroad. Tennant Avenue widening from Vineyard Blvd to Monterey Road Commercial and Industrial Tennant Avenue Business Park - Design for the installation of public utilities, landscaping and street improvements. Residential Developments City of Gilroy Country Estates, - Private hillside development project with 2.5 miles of trunk sewer 12" to 24" diameter including bore and jacking at two locations at State Hwy. 152 and country roadway on Santa Teresa. Included also were municipal water systems creating two new pressure zones with 3 triplex booster pump stations and standby power and telemetry plus 4 - 0.4 million gallon reservoirs. City of Hollister Sherwood Forest, a 51 lot subdivision including 2000 ft. long offsite 42 inch storm main installation on Haydon Street and reconstruction of Prune Street between Knights lane and Haydon Street. Parkside - a 65 lot subdivision. Santa Clara County San Benito County Cienega Road Landslide Repair - Rebuild 1.2 miles of a county road in 8 locations. Existing pavement, 24 feet wide, experienced slope failure and collapsed. Scope of work included aerial topographical survey, soil investigation coordination, retaining wall design, full improvement plans, construction staking Cienega Road Realignment - Realign 0.6 miles of a county arterial road. New road is 32 feet of pavement in an 84 foot right of way. Scope of work includes aerial topographical survey, various alignment studies, box culvert design, full improvement plans, right of way acquisition descriptions, soils investigation coordination. Fairview/ Fallon Road Realignment - Realign 0.5 miles of Fairview Road and 500 feet of Fallon Road. Scope of work includes topographic survey, design with superelevations and improvement plans.
Copyright
© 2006 - MH engineering Co. Morgan Hill, CA - web address - www.mhengineering.com
Web Site
Last Updated on April 26, 2006
|